[2021] Use Valid New MB-320 Test Notes & MB-320 Valid Exam Guide
MB-320 Actual Questions Answers PDF 100% Cover Real Exam Questions
NEW QUESTION 45
A glass bottle manufacturer uses route operations to schedule resources and track manufacturing costs.
The company has recently seen an increase in demand and purchases another resource. The company uses the same costs per resource. However, the new resource costs more to run. The company must be able to track cost contributions for the new resource.
You need to create a cost category for the new resource.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 46
You are a functional consultant for Contoso Entertainment System USA (USMF).
You need to assign a cost of 1,000 US dollars to the night shift.
To complete this task, sign in to Dynamics 365 portal. You must complete Task 1 before completing this task. Task 1 is the creation of a new cost category named NightShift for the night shift.
Answer:
Explanation:
See explanation below.
Explanation
You need to configure a cost group with the type set to 'Direct Manufacturing'. This cost group can then be associated to the Nightshift cost category.
* Navigate to Production control > Setup > Routes > Cost groups
* Click the +New button to add a new cost group.
* Give the cost group a name such as Nightshift.
* Configure the cost group type to be Direct Manufacturing.
* Configure the behavior to Fixed.
* Go to the NightShift cost category.
* Enter 1000 in the Cost Price
* Select the Nightshift cost group in the
* Click Close to close the window.
NEW QUESTION 47
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company uses Dynamics 365 Supply Chain Management to manage production configuration.
A product designer creates a remote control toy that can be purchased with different tire sizes.
Sales representatives need to perform product configuration for the custom tire variants when they create a new order.
Solution: Select the custom tire size when filling out each sales quotation line.
Does the solution meet the goal?
- A. No
- B. Yes
Answer: A
NEW QUESTION 48
A Discrete manufacturing company produces speakers. The high-end speaker model uses protective rubber strips on the edges.
Approximately five inches of rubber is consistently scrapped in the production process, regardless of production quantity. Workers manually consume the extra material on the picking list or scrap it in an inventory journal.
You need configure the system to automatically account for this scrap on the Bill of materials (BOM).
What should you do?
- A. Add an additional BOM line for five inches and set consumption to Variable
- B. Set a variable scrap of five percent for the rubber BOM line
- C. Set a Constant scrap of five on the BOM line for rubber
- D. Increase the required quantity of the rubber component by five on the BOM
Answer: C
Explanation:
Section: Create and manage production and lean orders
Explanation/Reference:
References:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-information-used-in-bom-calculations- with-standard-costs
NEW QUESTION 49
A customer produces light projection toys for holiday decorations throughout the year. Vendors have negotiated rebate agreements as a condition of their contact. The contract also contains the visual templates required for the customer to use in a season.
Vendor rebate agreements must only be applied if the following requirements are met:
Units of measure for deliverables are the same unit of measure as on the agreement The agreement is valid as of the date a purchase order is generated You need to configure the vendor rebate agreements.
What should you do?
- A. Set the Rebate line break type field value to
- B. Set the Rebate line break type field value to
- C. Set the Unit of measure rebate option field value to Exact match
- D. Set the Cumulative purchase by field value to the beginning of the season date
Answer: C
Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/procurement/vendor-rebates
NEW QUESTION 50
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solutions, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean process. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
1.) Create a purchase agreement for the subcontracting vendor and add SP-01 as the painting service
2.) Create a vendor resource then create a work cell for outsourced painting and add the resource to the work cell
3.) Create a production flow process activity for the painting work cell and add the component to be painted as a picking activity
4.) Create a service term to tie the purchase agreement to the activity Does this solution meet the goal?
- A. No
- B. Yes
Answer: A
NEW QUESTION 51
You are a functional consultant for Contoso Entertainment System USA (USMF).
USMF plans to categorize a new night shift in its factory.
You need to create a new cost category named NightShift for the night shift.
To complete this task, sign in to Dynamics 365 portal.
Answer:
Explanation:
See explanation below.
* Go to Organization Administration
* Click New to create a new shared category.
* Give the shared category an ID and a name (NightShift).
* Select the Can be used in Production
* Back in Organization Administration Categories.
* Click New to create a new category.
* Select the Category ID from the shared category.
* The category will inherit the ID and name (Nightshift) from the shared category.
* Click Close to close the window.
NEW QUESTION 52
A company is implementing Dynamics 365 Supply Chain Management in their manufacturing environment. The manufacturing process uses formulas to direct material consumption on the batch orders.
During production some items in the formula must be consumed automatically from the production area, while some must be picked with their actual consumption reported on a pick list.
You need to determine which setup method is used for formula lines to allow for the desired mixed method picking processes.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. Leave the flushing principle blank on formula lines and set resource consumption to direct flushing principle of materials based on consumption method for the line.
- B. Leave the flushing principle blank on formula lines and set default flushing principle on the items based on consumption method for the item.
- C. Set the flushing principle on each formula line based on consumption method for the line.
- D. Leave the flushing principle blank on formula lines and set the default start value to Always for Automatic Bill of Material Consumption.
Answer: A,C
NEW QUESTION 53
A company implements Dynamics 365 for Finance and Operations.
You run a master plan each week.
You need to resolve the issue in the scenario.
What should you do? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/job-scheduling
NEW QUESTION 54
A company that uses Lean manufacturing concepts to produce paper plates has redesigned the layout of the warehouse and production floor.
The company's production flow activities no longer match the tasks of the workers. Employees use paper and manual communication to complete the tasks.
You need to update the production flows to match their current processes by deactivating the obsolete production flows and creating new ones.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
NEW QUESTION 55
You are the product definition manager for a car manufacturing company. You set up and maintain the production configuration models used at the company.
You must build a new configuration model and include constraints in the model.
You need to determine which constraint type to use for each scenario.
Which constraint type should you use? To answer, drag the appropriate constraint types to the correct scenarios. Each constraint type may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 56
A company produces rubber hose using Discreet orders accounts for raw material scrap after report as finished through inventory movement journals.
The company has noticed that most of the scrap that is recorded is due to start up that feeds the hose to the finishing process. In addition, the amount of scrap that is recorded is consistent regardless of the amount of hose being produced.
You need to account for material cost during startup.
What should you do?
- A. Enter the amount of scrap that is consumed as constant scrap in the Bill of materials.
- B. Enter the amount of scrap that is consumed as variable scrap in the Bill of materials.
- C. Enter the consumption amount on the line to match the actual amount used.
- D. Do a case study for the scrap items and enter the average amount of scrap as a separate line items on the Bill of materials.
Answer: A
NEW QUESTION 57
You are the production scheduler for a manufacturing company. You have run the Resource Group Capacity report as shown in the Resource Group 21 Capacity exhibit. (Click the Resource Group 21 Capacity tab).
After reviewing that report, you run Resource Capacity reports as shown in the Resource 2101 and 2102 Capacity exhibits. (Click the 2101 Capacity and 2102 Capacity tabs.)
You run the Gantt chart report as shown in the Gantt exhibit to determine the production orders scheduled on the resources. (Click the Gantt tab.)
You need to determine the method to schedule the production lines.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 58
You are the production planner for a manufacturing company.
After running operations scheduling for a production order, the following error message displays:
You need to identify the cause of the error.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Review the available resources for Operation 10. Navigate to the Resource form and validate whether there is a calendar assigned
- B. Review the resource group assigned to Operation 10. Check to see if there is a calendar assigned and if the calendar is expired.
- C. Navigate to the work calendar and view working times. Validate that there are working days created in the scheduled period.
- D. Review the calendar for the resource to determine if it is expired.
Answer: A,D
NEW QUESTION 59
A company produces pipe at certain fixed lengths.
The company must be able to schedule cutting machines. You set up the cutting machines as resources. All cutting resources can produce many of the products. There are some products that require cutting machines that can produce longer lengths of product. Only some of the machines can do this.
You need to configure the resources to account for these different products.
What should you do?
- A. Build capability related to length and assign to the appropriate resources.
- B. Create a resource for each length.
- C. Configure the Data/Hour option on the Capacity unit field on the resource.
- D. Create a resource group for each length.
Answer: C
NEW QUESTION 60
A company produces homeopathic lotions for pain relief and uses Dynamics 365 Supply Chain Management.
You have replaced the vendor of a product's active ingredient with a new vendor. The new vendor is supplying the ingredient at a higher concentration of 25 percent.
The previous vendor concentration was 15 percent. You are consistently running out of two of the complimentary ingredients.
You need to update the formula and ingredient settings to allow for better order planning.
What should you do?
- A. Modify the minimum and maximum value of the attribute for the active ingredient
- B. Modify the factor value of the compensation principle
- C. Modify the target value of the attribute for the compensating ingredients
- D. Modify the target value of the attribute for the active ingredient
Answer: B
Explanation:
Explanation/Reference:
NEW QUESTION 61
A company produces lotions for pain relief and uses Dynamics 365 for Finance and Operations.
You have been provided the following information for a new relieving lotion.
Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:

NEW QUESTION 62
A company produces homeopathic lotions for pain relief and uses Dynamics 365 for Finance and Operations.
Several components used in the production of the pain-relieving lotion and oils have special government-mandated reporting requirements.
You need to ensure the company can provide the appropriate reporting and tracking for these components.
Which parameters should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 63
You produce 100 total units of finished goods. The amount of material used to produce the goods is the equivalent amount of material needed to produce 105 finished goods. The company must track variances in material compared to the original estimated amount You must only use one picking list journal for each production order. You need to post a picking list that accounts for the material required to produce 105 finished goods. What should you do?
- A. In the Bill of materials production details, edit the estimated amount for each line to equal 105 units of raw material.
- B. Report as finished five additional units into the good quantity and post a picking list for only the originally estimated amount.
- C. When creating the lines for a picking list, select the estimated consumption option and override the consumption field with the actual amount to be consumed.
- D. Post a picking list for 100 to account for the originally estimated amount. Post an additional picking list to account for the equivalent amount of material to produce 5 finished goods.
Answer: C
NEW QUESTION 64
A company implements Dynamics 365 for Finance and Operations. You must use functionality in the system for group production runs to prevent downtime and excessive cleaning of the machines on the production line.
You need to set up the system.
Which behaviors should you expect? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:

NEW QUESTION 65
A company implements Dynamics 365 Supply Chain Management.
Due to increased demand and limited space in the work cell area for product L0050, you must subcontract overflow work to another company. You have the following requirements:
* Locate a warehouse at the subcontractor building.
* Support picking and shipping activity tracking.
* Associate costs of transporting materials between the locations in the cost of the finished product.
You need to modify the production flow.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Modify the overflow work activity and assign it to subcontractor
- B. Create a resource and work cell resource group for the subcontractor
- C. Modify the overflow work operation and associate it with the subcontractor
- D. Create a new production flow version
- E. Create transfer activities and assign them to the subcontractor
Answer: A,B,E
Explanation:
Explanation/Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/manage-subcontract-work- production
NEW QUESTION 66
A customer produces light projection toys for holiday decorations throughout the year.
You must implement Bills of material (BOMs) for the product lifecycle. The solution must meet the following requirements:
You need to create a BOM for each phase.
Which BOM types should you use? To answer, select the appropriate configuration options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 67
A company produces generic and name-brand paper plates in the same factory using standard costing and using the same Bill of materials and routes to produce both products.
The finance and production teams want a way to view individual raw material consumption costs in the ledger.
You need to add a production group to control postings to the ledger.
What should you do?
- A. Create a production pool for the finished good item
- B. Create a production group for the finished good item
- C. Create a new Bill of materials with alternate costs for the raw material
- D. Update the cost of the generic finished good item
Answer: B
NEW QUESTION 68
......
The Microsoft MB-320: Microsoft Dynamics 365 Supply Chain Management, Manufacturing exam mainly measures the candidates’ skills that are required to become an experienced Functional Consultant. These include configuring Dynamics 365 Supply Chain Management, Manufacturing; handling manufacturing processes; implementing master planning for production; implementing other manufacturing features. This test is part of the requirements for earning the Microsoft Certified: Dynamics 365 Supply Chain Management, Manufacturing Functional Consultant Associate certification.
Microsoft Supply Chain Management, Manufacturing Exam Certification Details:
| Books / Training | MB-320T00: Microsoft Dynamics 365 Supply Chain Management, Manufacturing |
| Exam Price | $165 (USD) |
| Exam Name | Microsoft Certified - Dynamics 365 Supply Chain Management, Manufacturing Functional |
| Sample Questions | Microsoft Supply Chain Management, Manufacturing Sample Questions |
| Duration | 120 mins |
| Passing Score | 700 / 1000 |
| Number of Questions | 40-60 |
| Exam Code | MB-320 |
| Schedule Exam | Pearson VUE |
MB-320 Exam questions and answers: https://www.braindumpsit.com/MB-320_real-exam.html
Pass MB-320 Exam Info and Free Practice Test : https://drive.google.com/open?id=15nCun0lgdw0khXXmSuxWRDcMWX3sjtx8