[Nov-2021] Free C-TS4CO-2020 Exam Questions C-TS4CO-2020 Actual Free Exam Questions [Q20-Q36]

Share

[Nov-2021] Free C-TS4CO-2020 Exam Questions C-TS4CO-2020 Actual Free Exam Questions

Verified C-TS4CO-2020 dumps and 182 unique questions

NEW QUESTION 20
Which views can you use to analyse the costing results withn the costing run tool?

  • A. Material list report
  • B. Work in progress report
  • C. Costing levels report
  • D. Variance report
  • E. Analysis report

Answer: A,C,E

 

NEW QUESTION 21
For which objects can you revaluate activities and business processes at actual prices? There are THREE correct answers for this question

  • A. Work breakdown structure elements
  • B. Profit centers
  • C. Work centers
  • D. Cost centers
  • E. Profitability segments

Answer: A,B,E

 

NEW QUESTION 22
Plan revenu = 3000 Plan costs = 2000 Actual revenue = 1200 Actual costs = 1000

  • A. Revenue = 1200; Cost of sales = 800; WIP = 200
  • B. Revenue = 1200; Cost of sales = 1000; Reserve = 200
  • C. Revenue = 1200; Cost of sales = 800; Reserve = 200
  • D. Revenue = 1200; Cost of sales = 1000; WIP = 200

Answer: A

 

NEW QUESTION 23
Which customizing activity do you perform in overhead cost controlling?

  • A. Maintain costing variant parameters
  • B. Define cost centers categories
  • C. Define cost center categories
  • D. Create value fields

Answer: C

 

NEW QUESTION 24
How can you define the overhead rate in a costing sheet? 2 answers

  • A. As percentage rate
  • B. As quantity-based surcharge
  • C. As equivalence number
  • D. As lot-based surcharge

Answer: A,C

 

NEW QUESTION 25
Which objects do you use when you assign costs and revenue to the value fields in costingbased CO- PA?

  • A. Allocation structure
  • B. Overhead group
  • C. Transfer structure
  • D. Allocation template

Answer: A

 

NEW QUESTION 26
You want to use a template for activity and process assignment to your material cost estimate. What do you need to do ?

  • A. Assign a template to an operation in the routing of the material
  • B. Use the costing sheet of the costind view 1 in the template determination table
  • C. Use the template allocation function in the material cost estimate and the costing run
  • D. Assign a template directly to costing view 1 of the material master record

Answer: C

 

NEW QUESTION 27
you are configuring internal order settlement. Where do you define which cost elements should be settled, using either the original or settlement cost elements?

  • A. Settlement profile
  • B. Allocation structure
  • C. Template
  • D. Settlement rule

Answer: B

 

NEW QUESTION 28
Which of the following statements best describe Product Cost by Period? 2 Answers

  • A. It is used to analyse work in a process based on actual costs
  • B. It is used joint production with process orders
  • C. It is used when the focus of controlling is on a stable continuous production process
  • D. It is used in conjunction with a product cost collector

Answer: C,D

 

NEW QUESTION 29
When you define assessment cycles for the period-end closing in overhead cost accounting, which object can you assign to the cycle segment?

  • A. Allocation structure
  • B. Template
  • C. Settlement rule
  • D. Costing sheet

Answer: A

 

NEW QUESTION 30
You define rules in a status profile and assign the profile to your internal order type. What do you use the status profile for? 3 Answers

  • A. To define users for the order
  • B. To set the initial status as Created or Released
  • C. To activate the CO partner update
  • D. To define the user status
  • E. To permit or forbid specific transactions

Answer: B,D,E

 

NEW QUESTION 31
What are the benefits of using valuated sales order stock compared to non-valuated sales order stock?
There are TWO correct answers for this question

  • A. Production cost calculation
  • B. Combined quantity and value flow analysis
  • C. Simplified inventory value determination
  • D. Production order settlement to sales order

Answer: B,C

 

NEW QUESTION 32
When you create a profit center, what company code(s) is it assigned to by default ?

  • A. All company codes, irrespective of controlling area
  • B. All company codes within the operating concern
  • C. All company codes within the controlling area
  • D. All company codes where profit center is activated

Answer: C

 

NEW QUESTION 33
Which criteria do you use to specify the G/L account for the work in process (WIP) settlement? There are THREE correct answers for this question

  • A. Results analysis method
  • B. Results analysis cost element
  • C. Results analysis category
  • D. Results analysis version
  • E. Results analysis profit center

Answer: A,C,D

 

NEW QUESTION 34
Which are levels of internal order planning? There are TWO correct answers for this question

  • A. Overall planning
  • B. Integrated planning
  • C. Group costing
  • D. Primary and secondary cost and revenue planning

Answer: A,B

 

NEW QUESTION 35
You would like to allocate primary and secondary costs from a cost center to another cost center. Which allocation method will you use ?

  • A. Assessment
  • B. Distribution
  • C. Periodic reposting
  • D. Indirect activity allocation

Answer: A

 

NEW QUESTION 36
......


SAP S/4HANA Management Accounting Certification Exam Details:

Reference BooksTS4F03 (SAP S/4HANA 2020)
TS4F04 (SAP S/4HANA 2020)
TS4F03 (SAP S/4HANA 1909)
TS4F04 (SAP S/4HANA 1909)
Exam NameSAP Certified Application Associate - SAP S/4HANA for Management Accounting (SAP S/4HANA 2020)
SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates (SAP S/4HANA 1909)
Schedule ExamSAP Training
Duration180 mins
Passing ScoreC_TS4CO_2020 - 64%
C_TS4CO_1900 - 63%
Exam CodeC_TS4CO_2020
Exam Price$550 (USD)
LevelAssociate
Number of Questions80
Sample QuestionsSAP S/4HANA Management Accounting Certification Sample Questions


SAP C-TS4CO-2020 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Define, create and configure cost centers, cost center hierarchies and cost center groups
  • Organizational Assignments and Process Integration
Topic 2
  • Define currency and assign the chart of accounts, result analysis
  • Determine general reporting requirements for cost centers, configure cost center reporting
Topic 3
  • Determine planning, actual and process flow and security requirements
  • Distinguish between order category and order type. Determine plan data
Topic 4
  • Determine and configure product cost planning, define interface from CO-PCP (Product Cost Planning) to CO-PA (Profitability Analysis)
Topic 5
  • Define, create and configure internal orders and create a concept for internal order accounting
  • costing variants and multi-level costings, and carry out a Price update in the material master record
Topic 6
  • Determine and configure cost object controlling - planning and actuals, and customize
  • Configure profitability analysis and determine the operating concern
Topic 7
  • Define value fields, characteristics and summary characteristics
  • Define scopes and processes in Management Accounting, cross-company code design
Topic 8
  • Define WIP, results analysis, variances and revenue recognition
  • Determine cost elements structure, cost component structure
Topic 9
  • Design process flows and develop authorization concept for reporting of FI
  • CO data
  • create Profit Centers and check master data assignments, and configure period-end closing for PCA
Topic 10
  • Determine usage of Cost Center Accounting and type of planning functionality
  • Create organizational charts for profit centers, determine Profit Centers (in FI in the new GL)

 

Latest 100% Passing Guarantee - Brilliant C-TS4CO-2020 Exam Questions PDF: https://www.braindumpsit.com/C-TS4CO-2020_real-exam.html