Try Before You Buy

Download a free sample of any of our exam questions and answers

  • 24/7 customer support, Secure shopping site
  • Free One year updates to match real exam scenarios
  • If you failed your exam after buying our products we will refund the full amount back to you.

Updated Oct-2021 Test Engine to Practice Test for C-TS422-2020 Exam Questions and Answers! [Q36-Q58]

Share

Updated Oct-2021 Test Engine to Practice Test for C-TS422-2020 Exam Questions and Answers!

SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Certification Sample Questions and Practice Exam

NEW QUESTION 36
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Picking list
  • B. Transfer Order
  • C. Kanban
  • D. Backflushing

Answer: A

 

NEW QUESTION 37
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work Center BOM
  • B. Sales Order BOM
  • C. Functional Location BOM
  • D. Class BOM

Answer: B,C

 

NEW QUESTION 38
What is the purpose of collective orders?

  • A. To manage production orders for an entirefinished product on multiple levels
  • B. To post any component withdrawals single back flush with order confirmation
  • C. To combine order management of co-products and by-products with the main product
  • D. To post production costs ona cost collector instead of the production order

Answer: A

 

NEW QUESTION 39
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.

  • A. Supply Chain Management (SCM)
  • B. Material Requirements Planning (MRP)
  • C. Capacity Requirements Planning (CRP)
  • D. Integrated Business Planning (IBP)

Answer: A,D

 

NEW QUESTION 40
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers tothis question.

  • A. Add the agreement to the source list and mark itfor MRP relevance.
  • B. Add the agreement to the quota arrangement and mark it for MRP relevance.
  • C. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
  • D. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.

Answer: A,C

 

NEW QUESTION 41
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.

  • A. In the production version
  • B. In the production order type
  • C. In the MRP controller
  • D. In the routing
  • E. In the bill of materials (BOM)

Answer: B,C,D

 

NEW QUESTION 42
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.

  • A. In-house production time
  • B. Total replenishment lead time
  • C. Operation duration
  • D. Planned delivery time

Answer: A,D

 

NEW QUESTION 43
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.

  • A. Fixed pegging (on/off)
  • B. Finiteness level (0...1)
  • C. Planning mode (bucket/sequence)
  • D. Direction (forward/backward)
  • E. Scheduling control (finite/infinite)

Answer: C,D,E

 

NEW QUESTION 44
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

  • A. Specify a positive planning horizon in the strategy profile.
  • B. Specify a negative planning horizon in the strategy profile.
  • C. Specify a negative offset time in the strategy profile.
  • D. Specify a positive offset time in the strategy profile.

Answer: C

 

NEW QUESTION 45
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?

  • A. When the MRP results are saved
  • B. When you create a sales order
  • C. When you create a planned order
  • D. When you deliver a sales order

Answer: B

 

NEW QUESTION 46
Where do you maintain the duration of a producton operation?

  • A. Material master
  • B. Routing
  • C. Bill of material (BOM)
  • D. Work instructions

Answer: B

 

NEW QUESTION 47
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

  • A. Adjust the available capacity.
  • B. Reduce the planning window.
  • C. Select an alternative mode on a resource.
  • D. Form optimum sequences to reduce setup times.
  • E. Execute a new production planning run.

Answer: A,C,D

 

NEW QUESTION 48
What does the industry sector determine? Note: There are 2 correct answers to this question.

  • A. Whether a material master fieldis required, changeable, displayed, or hidden
  • B. Which material master views can be maintained
  • C. Whether material numbers are assigned internally or externally
  • D. Which transaction you can use to create a new material

Answer: A,B

 

NEW QUESTION 49
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

  • A. To reduce the number of material masters
  • B. Tosimplify the structure of bills of material
  • C. To reduce the number of changes required in bills of material
  • D. To increase the number of planning levels
  • E. To make the assignment of components easier

Answer: B,C,E

 

NEW QUESTION 50
Which master data object governs the relationship between supply source and demand source in the Kanban process?

  • A. Control cycle
  • B. Production supply area
  • C. Rate routing
  • D. Replenishment strategy

Answer: A

 

NEW QUESTION 51
What is the difference between co-products and by-products?

  • A. Only co-products appear in the processor production order settlement rule.
  • B. Only co-products are identified by a special item category in the bill of material (BOM).
  • C. Only by-products have a zero inventory valuation.
  • D. Onlyco-products can be manufactured in isolation from the main product.

Answer: A

 

NEW QUESTION 52
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?

  • A. Use a propagation range.
  • B. Use a planning group.
  • C. Use a heuristic.
  • D. Use a resource group.

Answer: C

 

NEW QUESTION 53
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Wait time
  • B. Move time
  • C. Float before production
  • D. Pick/pack time
  • E. Queue time

Answer: A,D,E

 

NEW QUESTION 54
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
  • B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
  • C. An evaluation that is ordered according to thebill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
  • D. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.

Answer: C

 

NEW QUESTION 55
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.

  • A. The planning strategy is infinite.
  • B. The work center has several individual capacities.
  • C. The Change Planning Direct on indicator is set.
  • D. Alternative resources are fully occupied.

Answer: A,B

 

NEW QUESTION 56
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

  • A. The previously dispatched operation stays as is the new operation is insertedafter the dispatched operation.
  • B. The new operation is inserted at the desired time the previously dispatched operation is moved backward.
  • C. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.
  • D. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.

Answer: B

 

NEW QUESTION 57
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Posting of goods receipt for the product
  • B. Posting of production costs to the production cost collector
  • C. Archiving of documents for assembly scrap
  • D. Material staging for next order in sequence
  • E. Reduction of associated capacity requirements

Answer: A,B,E

 